<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/"
     xmlns:pp="http://www.presspage.com/rss/"
     version="2.0"
     xmlns:atom="http://www.w3.org/2005/Atom">
                <channel>
                    <title><![CDATA[YVR News]]></title>
                    <link>https://news.yvr.ca/</link>
                    <description></description>
                    <language>en-ca</language>
                    <lastBuildDate>Tue, 08 Sep 2026 21:03:55 +0200</lastBuildDate>
                    <pubDate>Wed, 22 Apr 2026 21:11:45 +0200</pubDate>
                    <image>
                        <title><![CDATA[YVR News]]></title>
                        <url>https://content.presspage.com/clients/150_2978.png</url>
                        <link>https://news.yvr.ca/</link>
                        <width>144</width>
                    </image><item>
                        <title>2026 South Airfield Maintenance and Construction Projects</title>
                        <link>https://news.yvr.ca/southairfield/</link>
                        <guid>https://news.yvr.ca/southairfield/</guid><pp:caseid>606093</pp:caseid><description><![CDATA[<p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;">Throughout 2026, YVR is conducting a series of construction and maintenance projects to continually improve and modernize our airport, including our south airfield. Travellers and nearby communities may notice temporary changes to runway use at YVR as a result of ongoing construction projects. This work is required to ensure we maintain a high level of aviation safety for passengers, aircraft, staff and our community. It also prepares us for further upcoming work on other parts of the airfield. &nbsp;</span></p><p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;">YVR plans and schedules these projects to minimize effects of the work and appreciate everyone’s patience as we complete these projects safely and as quickly as possible. &nbsp;</span></p><p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;"><strong>LATEST UPDATE:</strong>&nbsp;</span></p><p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;">Routine and preventative maintenance activities on the South Runway will continue through the winter and spring. Work will be done on Saturday nights throughout the year, as well as additional dates as required. As our plans are further developed, we will post information on runway closures here: </span><a href="https://www.yvr.ca/en/about-yvr/noise-management/south-runway-maintenance-schedule" target="_blank"><span style="margin:0px;padding:0px;"><u>South Runway Maintenance Schedule | YVR.</u></span></a><span style="margin:0px;padding:0px;">&nbsp;</span></p><p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;">During these work periods, the South Runway will be closed, and the North Runway will be used for all take-offs and landings to allow safe access to work areas.&nbsp;</span></p><p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;">As a result of the nighttime closures of the South Runway, some communities under the flight path of the North Runway and neighborhoods to the north of the airport may notice increased aircraft activity over their community. We are carefully coordinating work to minimize the overall duration and effects of these temporary runway closures. &nbsp;</span></p><p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;">We want to assure our community members that we endeavour to work safety and as quickly as we can so that we can return to normal runway operations. &nbsp;</span></p><p style="margin-left:0px;text-align:left;"><span style="margin:0px;padding:0px;">If you have any questions about the south airfield maintenance and construction projects, please contact </span><a href="mailto:community_relations@yvr.ca" target="_blank"><span style="margin:0px;padding:0px;"><u>community_relations@yvr.ca</u></span></a><span style="margin:0px;padding:0px;">.&nbsp;</span></p>]]></description><category><![CDATA[project,south airfield,construction,airside]]></category>
            <pubDate>Tue, 07 May 2024 10:29:00 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/2978/dbf8adc2-6fe1-401d-8a5b-97ff4b3c5f9d/500_180-yvr-airside-may17-2023.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/2978/dbf8adc2-6fe1-401d-8a5b-97ff4b3c5f9d/500_180-yvr-airside-may17-2023.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/2978/dbf8adc2-6fe1-401d-8a5b-97ff4b3c5f9d/180-yvr-airside-may17-2023.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[A construction team on the south airfield wearing high-vis vests. A plane is also soaring overhead.]]></pp:imageTitle></item><item>
                        <title>Sea Island Climate Resilience Project</title>
                        <link>https://news.yvr.ca/sea-island-climate-resilience-project/</link>
                        <guid>https://news.yvr.ca/sea-island-climate-resilience-project/</guid><pp:caseid>623272</pp:caseid><description><![CDATA[<p><span>The Sea Island Climate Resilience Project is a proactive solution to address climate-related challenges, including implications of rising sea levels and increased risk of flooding. The project will see YVR upgrade the dike and drainage system on Sea Island by raising the existing perimeter dikes by approximately one metre to a total height of 4.7 metres and improving overall drainage and geotechnical stability.</span></p><p><span>Beginning in early 2026, YVR will be conducting works to upgrade the dike and drainage system along the eastern part of the Sea Island Conservation Area, known as SICA East. A portion of the SICA East area, including a walking trail, will be temporarily closed as this work takes place to ensure the safety of the community and workers. The trail will reopen once construction is completed.</span></p><p><span>We urge trail users to adhere to posted signage for their safety.</span></p><p><span>Please continue to check this page for the latest information on our dike and drainage upgrades.</span></p><p><span>Contact us about this project by emailing: </span><a href="community_relations@yvr.ca"><span>community_relations@yvr.ca</span></a><span>.</span></p><p>&nbsp;</p><p><span><strong>BACKGROUND</strong></span></p><p><span>YVR is situated in the heart of the traditional, unceded xʷməθkʷəy̓əm (Musqueam) territory, nestled between the Fraser River and the Salish Sea ecosystem. The airport coexists with a rich habitat of local wildlife, birds and plant species, and as such, YVR is guided by a commitment to serve both our community protect the important and sensitive environment from the increasing impacts of climate change.</span></p><p><span>The Sea Island Conservation Area (SICA), located on the northern edge of Sea Island, is managed by Canadian Wildlife Service of Environment and Climate Change Canada. It encompasses 140 hectares of land that is managed to provide habitat for birds and other wildlife in a manner that does not contribute to aviation safety hazards at Vancouver International Airport. Public use access is allowed where it is compatible with aviation safety and wildlife management goals.</span></p><p><span>Sea Island is safeguarded from sea levels and flooding by a perimeter dike system that spans 15 kilometres. The SICA East dike is a 2.5 kilometres dike within this system that borders the northeast side of Sea Island and the North Arm of the Fraser River.</span></p><p><span>As part of the Sea Island Climate Resilience Project, YVR is investing to improve the perimeter dike system and enhance the long-term resiliency of Sea Island, ensuring the airport and our infrastructure as well as our community is protected from seismic activity and impacts of climate change.</span></p><p><span>Sustainability practices are at the forefront of this work. We have conducted habitat and vegetation mapping, bird surveys and aquatic habitat surveys. Moreover, we have taken the necessary steps to ensure this project aligns with the Impact Assessment Act, Species at Risk Act, and the Fisheries Act.</span></p><p><span>Maintaining wildlife habitats is the of the utmost importance for SICA. Following the completion of work, habitat restoration efforts will restore any habitats that were disturbed, leaving the ecosystem in a healthy position. YVR is also Salmon Safe certified and will strive to incorporate aquatic habitat enhancements into the project.</span></p><p>&nbsp;</p><p><span><strong>PROJECT TIMELINES</strong></span></p><p><span>The planning process for the improvements to the dike system in the SICA East area of Sea Island is already underway, with the environmental assessment in progress.</span></p><p><span>Site investigation work took place in fall 2024.</span></p><p><span>Dike and drainage improvement work is scheduled to take place in from early 2026 to mid-2027, during which time the SICA East trail and surrounding area will be temporarily closed.</span></p><p><span>Work is scheduled for completion in summer 2027.</span></p><p><span>YVR is carefully planning and staging our work to minimize the overall project duration, however the exact duration of the work is dependent on several factors, including weather conditions.</span></p><p>&nbsp;</p><p><span><strong>COMMUNITY IMPACTS</strong></span></p><p><span style="text-align:start;">We recognize the temporary closure of the SICA East trail and surrounding area during the upgrade work in 2026 and 2027 will be challenging for some trail users.</span></p><p><span>Information on nearby trails and alternative access to beach areas along the Fraser River can be found </span><a href="https://www.richmond.ca/parks-recreation/parks-trails-cycling/trails-map.htm" target="_blank"><span>here</span></a><span>.</span></p><p>&nbsp;</p><p><span><strong>BENEFITS</strong></span></p><ul><li data-list-item-id="e873a3d014799373fc18271df2e36f1f4"><span>Enhanced flood protection system of Sea Island, to safeguard the community as well as YVR’s airfield and operations.</span></li><li data-list-item-id="e2af24ce276e7bb009f0a2620ad6863a4"><span>Mitigation of risk of land loss due to geotechnical instability.</span></li><li data-list-item-id="ead99ba7875eaf0f404826c6fe0790001"><span>Maintained wildlife habitat within the upgraded dike area.</span></li><li data-list-item-id="e457f323fc22fdfbb042f8919ae05520b"><span>Enhanced recreational area for the community.</span></li></ul>]]></description><category><![CDATA[project]]></category>
            <pubDate>Fri, 15 Mar 2024 10:35:26 -0700</pubDate>
            <enclosure url="https://content.presspage.com/uploads/2978/1b051de4-fdcf-4e7a-a491-25baac137031/500_ds-160501-096.jpg?10000" length="0" type="image/jpg" />
                <pp:image>https://content.presspage.com/uploads/2978/1b051de4-fdcf-4e7a-a491-25baac137031/500_ds-160501-096.jpg?10000</pp:image>
                <pp:imageOriginal>https://content.presspage.com/uploads/2978/1b051de4-fdcf-4e7a-a491-25baac137031/ds-160501-096.jpg?10000</pp:imageOriginal><pp:imageTitle><![CDATA[Sunset at YVR Terminal Looking South]]></pp:imageTitle><pp:imageDescription><![CDATA[Sunset at YVR Terminal Looking South]]></pp:imageDescription></item></channel>
                    </rss>